Resin Bound Installation at the HQ for Alternative Heat
At the end of the 2021 resin-bound season, Northstone Materials overcame challenging weather & deadlines to complete this Scheme for the new HQ for Alternative Heat in Banbridge. Tight windows of opportunities were maximised in partnership with McCue.
Thanks to the cooperation of Gareth Hodgen (McCue; Contracts Manager) & Andrew Braden (McCue; Site Manager), our Supervisor Graham Fullerton delivered an excellent installation. Kudos to Kieran Devlin and our Blacktop guys that prepared the substrate works within demanding tolerances.
For more information, visit the Anti-Skid surfacing of our website by clicking here – http://www.northstonematerials.com/decorative-surfacing